Machame Route
The most popular camping route on Kilimanjaro, approaching from the south-west with a natural "climb high, sleep low" profile via Lava Tower and the Barranco Wall.
Six established routes to Uhuru Peak. Compare length, scenery, difficulty and what is included before choosing your climb.
Kilimanjaro rises to 5,895 m above the plains of northern Tanzania. It is a walking ascent rather than a technical climb, which is what makes it possible for well-prepared first-timers — but altitude, not distance, is what decides whether you reach the summit.
Kilimanjaro Tours runs guided climbs on every official route. Each itinerary below shows the standard camp sequence and elevations; the operator's own pacing, crew arrangements and pricing are confirmed when you enquire.
Every route offers a different landscape, traffic level and acclimatisation profile. Open a route for its day-by-day itinerary.
The most popular camping route on Kilimanjaro, approaching from the south-west with a natural "climb high, sleep low" profile via Lava Tower and the Barranco Wall.
A longer western approach crossing the Shira Plateau, favoured for its gradual acclimatisation profile and quieter early days before joining the southern circuit.
The oldest established route and the only one with hut accommodation, ascending and descending on the same trail from the south-east.
The only route approaching from the north near the Kenyan border, with drier conditions and fewer climbers on the lower slopes.
The steepest and most direct route, joining the southern circuit at Barranco Camp. Suited to experienced, well-acclimatised trekkers.
The longest route on the mountain, circling the quiet northern slopes of Kibo for the most gradual acclimatisation of any itinerary.
Duration, difficulty, scenery, summit rate and starting price at a glance.
| Route | Duration | Difficulty | Scenery | Summit rate | Starting price |
|---|---|---|---|---|---|
| Machame Route | 6–7 days | Challenging | — | Price on request | |
| Lemosho Route | 7–8 days | Challenging | — | Price on request | |
| Marangu Route | 5–6 days | Moderate | — | Price on request | |
| Rongai Route | 6–7 days | Moderate | — | Price on request | |
| Umbwe Route | 6 days | Strenuous | — | Price on request | |
| Northern Circuit | 8–9 days | Moderate | — | Price on request |
No technical climbing skills are required, but you need good cardiovascular fitness and the ability to walk for several hours a day on consecutive days. Most climbers train for three to six months beforehand with regular hiking, stair work and aerobic exercise.
The driest periods are January to early March and June to October. The long rains fall from late March to May and the short rains in November; climbs still run in those months but expect wetter trails and more cloud.
Layered clothing for conditions from rainforest heat to sub-zero summit night, a warm sleeping bag rated to around −15 °C, waterproof shell layers, broken-in boots, trekking poles, a head torch and a daypack. A full checklist is sent after booking, and the operator will confirm which items can be rented locally.
All Kilimanjaro National Park permits are secured by the operator when the booking is confirmed. Park fees are included in the trek price. Booking several months ahead is recommended for peak-season dates.
Maximum group sizes and private-climb options will be confirmed by the operator.
Tell us your preferred route and dates. We confirm availability, pacing and an itemised price — or combine your climb with a safari.